{"id":536,"date":"2026-09-09T06:17:50","date_gmt":"2026-09-09T06:17:50","guid":{"rendered":"https:\/\/modularbelt.net\/plastic-modular-belt-rfq-checklist\/"},"modified":"2026-09-09T07:53:04","modified_gmt":"2026-09-09T07:53:04","slug":"plastic-modular-belt-rfq-checklist","status":"publish","type":"post","link":"https:\/\/modularbelt.net\/vi\/plastic-modular-belt-rfq-checklist\/","title":{"rendered":"Danh s\u00e1ch ki\u1ec3m tra y\u00eau c\u1ea7u b\u00e1o gi\u00e1 (RFQ) cho \u0111ai nh\u1ef1a m\u00f4-\u0111un"},"content":{"rendered":"
\n
\n

Danh s\u00e1ch ki\u1ec3m tra y\u00eau c\u1ea7u b\u00e1o gi\u00e1 (RFQ) cho \u0111ai nh\u1ef1a m\u00f4-\u0111un<\/h1>\n

B\u1ea3n y\u00eau c\u1ea7u b\u00e1o gi\u00e1 (RFQ) h\u1eefu \u00edch cung c\u1ea5p th\u00f4ng tin v\u1ec1 nh\u1eefng thay \u0111\u1ed5i \u0111\u1ed1i v\u1edbi d\u00e2y \u0111ai, h\u1ec7 th\u1ed1ng truy\u1ec1n \u0111\u1ed9ng v\u00e0 giao di\u1ec7n b\u0103ng t\u1ea3i. N\u00f3 kh\u00f4ng c\u1ea7n ph\u1ea3i d\u00e0i, nh\u01b0ng ph\u1ea3i \u0111\u1ea7y \u0111\u1ee7 v\u1ec1 m\u1eb7t k\u1ef9 thu\u1eadt.<\/p>\n<\/div>\n<\/section>\n

\n
\n

New conveyor RFQ<\/h2>\n
\n
\n
\"Wide<\/figure>\n<\/div>\n
\n

For a new conveyor, start with the application and geometry. Provide the conveyed product, belt width, path, transfers and proposed drive arrangement. Add load\/speed and process environment when known. The objective is to select a mechanically suitable family before asking for detailed material or documentation confirmation.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n

\n
\n

Replacement RFQ<\/h2>\n

For a replacement, add the existing belt as a physical reference: top, underside, hinge\/pin and sprocket photographs; pitch measured across several repeats; overall belt width; straight\/radius path; and any readable reference. If the old belt is damaged, photograph the damage and a healthy section separately.<\/p>\n<\/div>\n<\/section>\n

\n
\n

Core checklist<\/h2>\n
\n\n\n\n\n\n\n\n\n\n\n\n\n
Khu v\u1ef1c<\/th>\nG\u1eedi<\/th>\n<\/tr>\n<\/thead>\n
\u1ee8ng d\u1ee5ng<\/td>\nConveyed product and process step<\/td>\n<\/tr>\n
Geometry<\/td>\nWidth, length\/centre distance, straight\/curve, radius and transfers<\/td>\n<\/tr>\n
Th\u1eaft l\u01b0ng<\/td>\nPitch, face\/open area, hinge\/pin and edge<\/td>\n<\/tr>\n
L\u00e1i xe<\/td>\nShaft, sprocket, bore and spacing<\/td>\n<\/tr>\n
Ph\u1ee5 ki\u1ec7n<\/td>\nPins, guides, wear strips, tensioners as required<\/td>\n<\/tr>\n
Nhi\u1ec7m v\u1ee5<\/td>\nLoad, speed, wet\/dry condition and environment<\/td>\n<\/tr>\n
Thu\u1ed9c v\u1ec1 th\u01b0\u01a1ng m\u1ea1i<\/td>\nQuantity, destination and project stage<\/td>\n<\/tr>\n
Documents<\/td>\nDrawings\/material\/inspection requirements<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<\/section>\n
\n
\n

What not to leave ambiguous<\/h2>\n

Avoid descriptions such as \u201cstandard belt\u201d, \u201cfood belt\u201d or \u201csame as photo\u201d without dimensions. If a field is unknown, say it is unknown and provide a photograph. Explicitly missing data can be resolved; assumed data can create a wrong quotation.<\/p>\n<\/div>\n<\/section>\n

\n
\n

MOQ and sample planning<\/h2>\n

C\u00e1c linh ki\u1ec7n ti\u00eau chu\u1ea9n c\u00f3 s\u1ed1 l\u01b0\u1ee3ng \u0111\u1eb7t h\u00e0ng t\u1ed1i thi\u1ec3u (MOQ); c\u00e1c m\u1eb7t h\u00e0ng c\u00f3 gi\u00e1 tr\u1ecb cao\/k\u00edch th\u01b0\u1edbc l\u1edbn theo gi\u00e1 tr\u1ecb \u0111\u01a1n h\u00e0ng. M\u1eabu d\u00e0nh cho kh\u00e1ch h\u00e0ng m\u1edbi (1-5 chi\u1ebfc) v\u1edbi gi\u00e1 m\u1eabu. K\u1ebft h\u1ee3p nhi\u1ec1u m\u1eabu v\u1edbi gi\u00e1 1.500 USD. V\u1eadt li\u1ec7u\/quy tr\u00ecnh \u0111\u1eb7c bi\u1ec7t theo s\u1ed1 l\u01b0\u1ee3ng \u0111\u1eb7t h\u00e0ng t\u1ed1i thi\u1ec3u (MOQ) c\u1ee7a quy tr\u00ecnh. Kh\u00f4ng ch\u1ea5p nh\u1eadn \u0111\u01a1n \u0111\u1eb7t h\u00e0ng b\u00e1n l\u1ebb 1-2 chi\u1ebfc.<\/p>\n

For multiple models, list each configuration and quantity separately even when they are combined toward a commercial minimum. This prevents technical requirements from being merged accidentally.<\/p>\n<\/div>\n<\/section>\n

\n
\n

Files that help<\/h2>\n

PDF drawings, exported CAD views, photographs and spreadsheets can all be useful. Mark the critical dimensions and indicate whether a measurement is required for fit, process performance or internal approval.<\/p>\n<\/div>\n<\/section>\n

\n
\n

Before you send<\/h2>\n
\n

I only have photos. Is that enough?<\/h3>\n

Photos can start the review. Add pitch and belt width if you can measure them safely.<\/p>\n

I need several belt models. How should I list them?<\/h3>\n

Use one line per configuration with quantity and any distinct application\/geometry.<\/p>\n

Should I include sprockets?<\/h3>\n

Yes when they are being replaced, redesigned or needed to confirm the drive interface.<\/p>\n<\/div>\n<\/div>\n<\/section>\n

\n
\n

An RFQ can be short and still be complete<\/h2>\n

For a new conveyor, one marked-up layout plus a small table of width, path, product, load\/speed and environment can be enough to start. For a replacement, a photograph set plus pitch and width may be more useful than a long written description. The objective is not paperwork; it is to capture the variables that change the belt and its interfaces.<\/p>\n

List multiple belt models on separate lines. Keep quantity, application and any different materials or accessories attached to the correct line so technical requirements are not merged during quotation.<\/p>\n<\/div>\n<\/section>\n

\n
\n

Need help narrowing the configuration?<\/h2>\n

Send the information you already have. Missing fields can be identified during review rather than guessed.<\/p>\n

G\u1eedi y\u00eau c\u1ea7u b\u00e1o gi\u00e1<\/a><\/p>\n<\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"

B\u1ea3n y\u00eau c\u1ea7u b\u00e1o gi\u00e1 (RFQ) h\u1eefu \u00edch cung c\u1ea5p th\u00f4ng tin v\u1ec1 nh\u1eefng thay \u0111\u1ed5i \u0111\u1ed1i v\u1edbi d\u00e2y \u0111ai, h\u1ec7 th\u1ed1ng truy\u1ec1n \u0111\u1ed9ng v\u00e0 giao di\u1ec7n b\u0103ng t\u1ea3i. N\u00f3 kh\u00f4ng c\u1ea7n ph\u1ea3i d\u00e0i, nh\u01b0ng ph\u1ea3i \u0111\u1ea7y \u0111\u1ee7 v\u1ec1 m\u1eb7t k\u1ef9 thu\u1eadt.<\/p>","protected":false},"author":1,"featured_media":484,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/posts\/536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/comments?post=536"}],"version-history":[{"count":1,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/posts\/536\/revisions"}],"predecessor-version":[{"id":598,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/posts\/536\/revisions\/598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/media\/484"}],"wp:attachment":[{"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/media?parent=536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/categories?post=536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/modularbelt.net\/vi\/wp-json\/wp\/v2\/tags?post=536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}